Page 4
Daily Maintenance
Daily Maintenance
Management of tool
Before a work start, please carry out the tool check in accordance with the “startup
checklist” in this manual, and start work after checking that it satisfies a standard.
* Please record each check result simultaneously.
Removal of foreign substances
Since foreign substances such as dust and wire scrap adheres to a “connector holder”, etc.
during operation, please remove a foreign substance timely.
* Neglect may become the cause that the cap pressing lock imperfection.
Cleaning of work end
Please wipe with a dry cloth lightly after cleaning a tool with compression air every day
at the time of a work end. There is an effect that prevents rusting.
Lubrication
Please supply proper amount of the machine oil to the moveable points with the
frequency of once a month.
Shutting height size
57130-6000 : 25.4 0.1 mm
57131-6000 : 13.9 0.1 mm
The shutting height size between the housing holder and the lower jaw must be in the
standard value when grips the handle enough to the operation end. (Please refer the figure
on the next page)
[Standard value of shutting height size]
Tool of 57130-6000: 25.4+/-0.1 mm
Tool of 57131-6000: 13.9+/-0.1 mm