- 3 -
© 2021 MIMAKI ENGINEERING CO.,LTD.
7Attach the Leg stay to the left and right legs.
1. Hook the leg stay onto the screws installed in step 6.
2. Tighten the screw temporarily (just tighten lightly).
8Lock the casters.
9Attach the Base plate L/R.
• Fix the base plate to the leg with 2 screws (M5x15)
while pushing it in the direction indicated by arrow.
10 Attach the roll bars.
• Set the roll bar on top of the bearing installed.
11 Mount the Main unit on the legs.
1. Align the protruding part of the leg with the hole on
the bottom of the main unit (the ▽ mark on the side of
the main unit is a guide) and insert.
2. Make sure that the rubber foot on the bottom of the
unit is set on the leg.
3. Set the other side in the same way.
Attach the leg stay so that the openings of the left
and right legs are on the inside.
Attach it so that the bearing is on the outside..
Set the roll bar with four collars so that it is on the
outside.
The unit should be lifted by two or more people.
Hole
Rubber
Foot
Protrusion