PolyVision Frameless Flow インストールガイド

タイプ
インストールガイド
a3™ CeramicSteel Flow
Frameless Application
Installation Guide
Guidelines for installing your new
a3 CeramicSteel Frameless Flow
APAC 2019
English
中文
日本
국어
Doc # 143841 | Rev A | Page 1 of 50
3 Safety Requirements
4 Handling + Storing of Panels
5 Required Materials + Equipment
6 1830 Vertical Wall Bracket Positioning
7 2420 Vertical Wall Bracket Positioning
8 1830 Horizontal Wall Bracket Positioning
9 2420 Horizontal Wall Bracket Positioning
13 Warranty
English
a3 CeramicSteel Frameless Flow - Wall Mounted
Dry Erase Board, Non-Seismic Applications
Safety Requirements
Minimum Required Wall Construction
Drywall with metal studs:
Must be at least 0.6 mm (.02") thick Metal
stud 48.8 mm x 50 mm (1.92" x 1.97")
Studs on maximum 600 mm (24") centers
Must be at least 2 x 12,5 mm (.49") Type X
gypsum drywall
35 mm (1.34") drywall screws on 250 mm
(12") centers
Verify Wall Construction
CAUTION! Adequate wall construction is
required to support the weight of the board.
Minimum wall construction must be capable
of supporting weight amounts listed in Table
1 on page 4.
The building’s Engineer of Record must be
consulted to determine if there are any seismic
requirements.
Drywall with wooden studs:
Stud grade SPF, DFL or Hem-Fir 45 mm
x 70 mm (1.5” x 3.5”)
Studs on 600 mm (24”) centers
Must be atleast 25 mm (5/8”) thick Type X
gypsum drywall for the US or 2 x 12,5 mm (1/2”)
for EU
35 mm (#6 x 11/4”) drywall screws on 250 mm
(12”) centers
Doc #143841  Rev A  Page 3 of 50 Doc #143841  Rev A  Page 2 of 50
Handling + Storing of Panels
Handling
When a3 CeramicSteel panels are shipped, they
are protected by craft paper or a self-adhesive
transparent polyethylene ilm. Keep panels in the
original package until installation.
Handle with care to prevent damage.
Never slide panels o the stack during handling.
Panels should always be lifted and moved in a
vertical position.
Never place an a3 panel in a vertical position on
the loor. This is to prevent damage to the edges.
Prevent dirt from settling on and between panels
to avoid surface damage, scratches or defects.
Follow all safety instructions regarding personal
protection when processing the panels.
Protect panel surface against sawdust and
sparks (metal particles).
a3 CeramicSteel will chip when cut or drilled with
power tools. Hand-cutting can cause chipping
up to approx. 2 mm from the edge. When
chipping is in excess of 2 mm, please check the
state of cutting tools and check that the panel is
adequately supported and clamped to prevent it
from vibrating.
All cut or drilled sections should be protected
against humidity with PVC tape and/or by
covering/sealing proiles or sealing washers.
For detailed processing instructions, please refer
to the a3 processing instructions.
Storing
Keep panels dry and free of debris.
Store panels inside temps 5090 °F (1032 °C).
Any panels stored outside should be protected
from inclement weather conditions.
Place panels on hard, lat surfaces that are not
subject to standing water.
a3 CeramicSteel panels should be stacked no
more than three high.
Panels should never be stored vertically or in
such a way that the corners are vulnerable to
damage.
If you have a problem, question, or a request, call
your local fabricator, your regional sales manager
or PolyVision Customer Service. PolyVision’s global
customer service team can be contacted on
polyvision.com.
Table 1 Horizontal Installation
Product Weight (kg/lb)/panel
Frameless Flow 1830 28 kg / 61.73 lb
Frameless Flow 2420 37 kg / 81.57 lb
Drill
#2 Bit
Glass suction cup lifters (2)
Pliers
Pencil
Level or laser
2 or 3-step ladder
Tape measure
Required Materials + Equipment
Required Equipment
Materials Provided
NOTE: Items are not drawn to scale. Quantity of wall anchors and screws will vary per product
due to the various widths. Board size determines the quantity of anchors and screws.*
Horizontal wall bracketsVertical wall brackets
Horizontal oriented panels
or vertical oriented panels
Anchors Screws
Table 2
Product Panel A (right) Panel B (intermediate) Panel C (left)
# Vertical
Brackets
# Horizontal
Brackets
# Screws/
Anchors
# Vertical
Brackets
# Horizontal
Brackets
# Screws/
Anchors
# Vertical
Brackets
# Horizontal
Brackets
# Screws/
Anchors
Vertical Frameless Flow
Frameless Flow 1830 1 2 17 1 2 17 0 2 10
Frameless Flow 2420 1 3 24 1 3 24 0 3 15
Horizontal Frameless Flow
Frameless Flow 1830 1 2 15 1 2 15 0 2 10
Frameless Flow 2420 1 2 25 1 2 25 0 2 20
Frameless Flow Panels
Panel A Right
Panel B Intermediate
Panel C Left
Doc #143841  Rev A  Page 5 of 50 Doc #143841  Rev A  Page 4 of 50
Frameless Flow
1830 Vertical Wall Bracket Positioning
1. Deine the centerline of the Frameless Flow installation
2. Deine the centerline of panel A and panel C. This will be the centerline of the brackets.
If uneven panels: from center of wall left and right 1185 mm (465/8").
If even panel: from center of wall left and right 592.5 mm (235/16").
3. Deine the top of the wall to install from the ground level.
4. Measure 220 mm (811/16") down from top of predeined top of wall.
This mark is the bottom of the top wall bracket
5. Measure 1515 mm (595/8") down from the irst horizontal wall bracket to deine the position
of the second bracket.
6. Use the predrilled holes of the wall bracket as a template to mark all the holes.
Pre-drill 6,5 mm (1/4") hole in the drywall. Insert all anchors into the holes and screw them lush.
Fix all the brackets. Make sure the top brackets are perfectly aligned, leveled and ixed irmly.
Repeat for all the brackets.
Frontview
Frameless Flow
2420 Vertical Wall Bracket Positioning
1. Deine the centerline of the Frameless Flow installation
2. Deine the centerline of panel A and panel C. This will be the centerline of the brackets.
If uneven panels: from center of wall left and right 1185 mm (465/8").
If even panel: from center of wall left and right 592,5 mm (235/16")
3. Deine the top of the wall to install from the ground level.
4. Measure 220 mm (811/16") down from top of predeined top of wall.
This mark is the bottom of the top wall bracket
5. Measure 1065 mm (4115/16") down from the irst horizontal wall bracket to deine the position
of the second and 2105 mm down to the third.
6. Use the predrilled holes of the wall bracket as a template to mark all the holes.
Pre-drill 6,5 mm (1/4") hole in the drywall. Insert all anchors into the holes and screw them lush.
Fix all the brackets. Make sure the top brackets are perfectly aligned, leveled and ixed irmly.
Repeat for all the brackets.
Frontview
Doc #143841  Rev A  Page 7 of 50 Doc #143841  Rev A  Page 6 of 50
Frameless Flow
1830 Horizontal Wall Bracket Positioning
1. Deine the centerline of the Frameless Flow installation
2. Deine the centerline of panel A and panel C. This will be the centerline of the brackets.
If uneven panels: from center of wall left and right 1830 mm (72").
If even panel: from center of wall left and right 915 mm (36")
3. Deine the top of the wall to install from the ground level.
4. Measure 220 mm (811/16") down from top of predeined top of wall.
This mark is the bottom of the top wall bracket
5. Measure 870 mm (341/4") down from the irst horizontal wall bracket to deine the position
of the second bracket.
6. Use the predrilled holes of the wall bracket as a template to mark all the holes.
Pre-drill 6,5 mm (1/4") hole in the drywall. Insert all anchors into the holes and screw them lush.
Fix all the brackets. Make sure the top brackets are perfectly aligned, leveled and ixed irmly.
Repeat for all the brackets.
Frontview
Frameless Flow
2420 Horizontal Wall Bracket Positioning
1. Deine the centerline of the Frameless Flow installation
2. Deine the centerline of panel A and panel B/C. This will be the centerline of the brackets.
If uneven panels: from center of wall left and right 550 mm (215/8") + 1320 mm (5115/16") +
1100 mm (435/16"). If even panel: from center of wall left and right 660 mm (26") + 1100 mm (425/16").
3. Deine the top of the wall to install from the ground level.
4. Measure 220 mm (811/16") down from top of predeined top of wall.
This mark is the bottom of the top wall bracket
5. Measure 870 mm (341/4") down from the irst horizontal wall bracket to deine the position
of the second bracket.
6. Use the predrilled holes of the wall bracket as a template to mark all the holes.
Pre-drill 6,5 mm (1/4") hole in the drywall. Insert all anchors into the holes and screw them lush.
Fix all the brackets. Make sure the top brackets are perfectly aligned, leveled and ixed irmly.
Repeat for all the brackets.
Frontview
Doc #143841  Rev A  Page 9 of 50 Doc #143841  Rev A  Page 8 of 50
7. Place Panel A onto the wall brackets by lifting it up, holding it against the wall
above the brackets and slide it downwards in the wall brackets. Make sure the
panel is perfectly level.
8. Clean the groove before inserting the vertical proile. Insert the vertical proile
in the groove starting 10 mm (3/8") from the top of the panel. Use the pre-drilled holes
as a template to mark the holes. Remove the proile and pre-drill 6,5 mm (1/4")
hole in the drywall. Insert anchors into the holes and screw them lush. Reinsert the
vertical proile and ix the proile at the area where the proile touches the wall.
Make sure the proile is ixed at least on top, middle and bottom.
Make sure the vertical proile is inserted completely in the groove over the length
of the panel.
10. Place Panel B/C: carefully insert bottom of panel at an angle at the bottom corner.
Let the panel slide towards the previous installed panel, make sure the panels make
contact over the length of the panel and snap it down irmly onto the horizontal
wall bracket.
Repeat as many times as there is a panel B.
Once all B panels are installed, repeat for panel C
Tip: To remove the panel, use opposite handling from installation.
Doc #143841  Rev A  Page 11 of 50 Doc #143841  Rev A  Page 10 of 50
©2019 PolyVision Corporation. All rights reserved. Trademarks used herein are the trademarks of PolyVision
Corporation or their respective owner. PolyVision Corporation reserves the right to make changes in
product design, construction or detail, and to discontinue any product or material without notice.
polyvision.com 07-31-19 ENG
CeramicSteel Surface: Forever warranty
PolyVision warrants that all porcelain-enameled surfaces and/or products made with
e3™ CeramicSteel (Premium Writing Surfaces) or a3™ CeramicSteel (Collaborative Products)
will retain its writing and erasing qualities and maintain its gloss variance and color
consistency for the life of the building or for as long as the product is in use, whichever
comes irst.
Panel Construction: 10 year limited warranty
PolyVision warrants that our panels, under normal atmospheric conditions and when sealed
from moisture, will not delaminate from the substrate or warp for a period of 10 years.
Accessories: 2 year limited warranty
PolyVision warrants that our accessories, including but not limited to Collaborative ToolBar
and round magnetic eraser, when used under normal conditions will perform as intended
for a period of 2 years. Consumables like markers and chalk sticks are not covered by the
Accessories warranty.
Should any failure to conform to this warranty become apparent, then, upon written notice
from the customer, PolyVision, at its option, will correct such nonconformity by repair or
replacement. Correction in the manner provided above shall constitute a fulillment of
all liabilities of PolyVision with respect to the quality of the CeramicSteel. The warranty is
applicable only under normal usage and maintenance and does not cover defects caused
by improper handling, vandalism or abuse, or arising from failure to follow PolyVision’s
instructions and recommendations for maintenance.
The warranty is voided if any modiications are made to the products by the customer or
other trades with or without PolyVision’s written consent or prior knowledge. The warranty
does not include the cost of removal or reinstallation. This warranty is eective as of July 12,
2019, and supersedes the terms and conditions of all prior surface warranties issued to the
customer by PolyVision.
This limited warranty is the sole remedy for product defects and no other express or
implied warranty is provided, including but not limited to any implied warranties of
merchantability or itness for a particular purpose. PolyVision shall not be liable for
consequential or incidental damages arising from any product defect.
Collaborative Products Warranty
Doc #143841  Rev A  Page 13 of 50 Doc #143841  Rev A  Page 12 of 50
3 全要求
4 挂板搬 + 存放
5 需材料 + 设备
6 1830 垂直墙定位
7 2420 垂直墙壁定位
8 1830 水平定位
9 2420 水平
13 保修
中文
a3 CeramicSteel Frameless Flow - 壁挂式安装易
板 ,非 区 使
要求
墙体构造最低要
带有金属立筋的石膏板墙
必须少为 0.6 mm (.02") 厚的 48.8 mm x 50 mm
(1.92" x 1.97") 金属立筋
位于 600 mm (24") 中心
必须少为 2 x 12.5 mm (.49") X 型石膏板墙
35 mm (1.34") 板墙钉位 250 mm (12") 中心
证墙体构造
小心墙体构造应以支撑挂板重量墙体构造
最低限度必须能够支撑第 4 页表 1 中所列的重
必须向建筑物档案工程师咨以明确是否有
何抗面的要求
带有木立筋的石膏板墙
筋为 SPFDFL Hem-Fir 级别 45 mm x
70mm (1.5” x 3.5”)
位于 600 mm (24”) 中心
对 于 国 ,必 少 为 25 mm (5/8”) 厚的 X 型石
墙 ,对 于 ,则 少 为 2 x 12.5 mm (1/2”)
35 mm (#6 x 11/4”) 膏板钉位于 250 mm
(12”) 中心
Doc #143841  Rev A  Page 15 of 50 Doc #143841  Rev A  Page 14 of 50
挂板 + 存放
搬运
在装 a3 CeramicSteel 挂板时挂板使用牛皮纸
或自粘性透明聚乙烯膜加以保护。装前一直将
板留在装箱内。
小心搬运止受损。
时切勿让挂板从货堆上滑应当始终举起挂
,令 其
切勿将 a3 挂板竖直放于地板上。以防挂板边
受损。
防止尘土落在挂板上或两个挂板之间以避免挂板
表 面 受 损 、刮 擦 或 产 生 陷 。
板时,守与人员防所有安
指示。
防止挂表面出现锯屑和火(金属颗粒)
当使用电工具 a3 CeramicSteel 进行切割或钻
孔时挂板将会碎裂。手动切割可导致挂板边缘出现
大约 2 mm 的碎裂。当碎裂宽度超过 2 mm 时 ,请
检查切割工具的状态并检查挂板是否有足够支撑
和夹合力,防止其生振
所有切或钻部分当使 PVC 胶带和/或覆
/密封型材或密封垫圈进行保护防止挂板受潮。
如 需 解 详 细 的 加 工 说 明 ,请 查 阅 a3 加工说
存放
挂板且没有碎屑
5090 °F (1032 °C) 的温度下存放挂板。
于室外存放的任何挂板,应当做好应
的防护措施。
将挂板放在不会积水硬平坦的表面
a3 CeramicSteel 挂板的堆叠高度不得超 3 英尺。
得将挂板竖直方式存否则挂板四角很容易
受损。
如果有任何问题、疑问或请求致电联系当地的制
造 商 、区 售 经 PolyVision 客 户 服 。可 访
polyvision.com,联 系 PolyVision 户服
团队。
1 水平安装
产品 重量 (kg/lb)/面板
Frameless Flow 1830 28 kg / 61.73 lb
Frameless Flow 2420 37 kg / 81.57 lb
电钻
2 号钻头
璃吸盘提升器 (2)
钳子
铅笔
尺或激光水准仪
2 级或 3 级梯
卷尺
所需材 + 设备
所需设备
提供的材
注意物品并非按比绘制由于不同产品有不同宽度,因此墙锚的数量也各不相同不同大小的挂
板也需要不同数量的墙锚和螺栓。*
水平墙垂直墙
横向面板或纵向面
墙锚 螺栓
2
产品 面板 A(右) 面板 B(中) 面板 C(左)
垂直架数 水平挂架数 螺栓/墙锚数 垂直架数 水平挂螺栓/墙锚数 垂直架数 水平螺栓/墙锚数
垂直 Frameless Flow
Frameless Flow 1830 1 2 17 1 2 17 0 2 10
Frameless Flow 2420 1 3 24 1 3 24 0 3 15
水平 Frameless Flow
Frameless Flow 1830 1 2 15 1 2 15 0 2 10
Frameless Flow 2420 1 2 25 1 2 25 0 2 20
Frameless Flow 面板
面板 A
面板 B
面板 C
Doc #143841  Rev A  Page 17 of 50 Doc #143841  Rev A  Page 16 of 50
Frameless Flow
1830 垂直墙定位
1. 确定 Frameless Flow 装中心线
2. 确定面板 A 和面板 C 中心线是支架中心线果有奇数块面墙面中心左右 1185 mm (465/8")
如果偶数块面板墙面中心左右 592.5 mm (235/16")
3. 确定墙壁安装上沿距地高度。
4. 从预先确定的墙壁上沿向测量 220 mm (811/16")此标记是上墙挂架下沿
5. 第一个水平墙架向下测量 1515 mm (595/8"),确 二 个
6. 使用墙壁挂架预钻孔作为模板,对所有孔进行标记。在石膏板墙上预钻 6.5 mm (1/4") 。将 所 有 墙 插 入
拧到齐平为止。固定所有支架。确保上支架完全对牢固。对剩余支架重复执以上操作。
前视图
Frameless Flow
2420 垂直墙
1. 确定 Frameless Flow 装中心线
2. 确定面板 A 和面板 C 中心线是支架中心线果有奇数块面墙面中心左右 1185 mm (465/8")
如果偶数块面板墙面中心左右 592.5 mm (235/16")
3. 确定墙壁安装上沿距地高度。
4. 从预先确定的墙壁上沿向测量 220 mm (811/16")此标记是上墙挂架下沿
5. 第一个水平墙架向下测量 1065 mm (4115/16")定第二个挂位置,向下测量 2105 mm 定第三
个挂架位
6. 使用墙壁挂架预钻孔作为模板,对所有孔进行标记。在石膏板墙上预钻 6.5 mm (1/4") 。将 所 有 墙 插 入
拧到齐平为止。固定所有支架。确保上支架完全对牢固。对剩余支架重复执以上操作。
前视图
Doc #143841  Rev A  Page 19 of 50 Doc #143841  Rev A  Page 18 of 50
Frameless Flow
1830 平墙定位
1. 确定 Frameless Flow 装中心线
2. 确定面板 A 和面板 C 中心线是支架中心线果有奇数块面墙面中心左右 1830 mm (72")。如
果有偶数块面板墙面中心左右 915 mm (36")
3. 确定墙壁安装上沿距地高度。
4. 从预先确定的墙壁上沿向测量 220 mm (811/16")此标记是上墙挂架下沿
5. 第一个水平墙架向下测量 870 mm (341/4"),确 二 个
6. 使用墙壁挂架预钻孔作为模板,对所有孔进行标记。在石膏板墙上预钻 6.5 mm (1/4") 。将 所 有 墙 插 入
拧到齐平为止。固定所有支架。确保上支架完全对牢固。对剩余支架重复执以上操作。
前视图
Frameless Flow
2420 平墙定位
1. 确定 Frameless Flow 装中心线
2. 确定面板 A 和面板 C 中心线是支架中心线果有奇数块面墙面中心左右 550 mm (215/8") + 1320mm
(5115/16") + 1100 mm (435/16")果有数块面板墙面中心左右 660 mm (26") + 1100 mm (425/16")
3. 确定墙壁安装上沿距地高度。
4. 从预先确定的墙壁上沿向测量 220 mm (811/16")此标记是上墙挂架下沿
5. 第一个水平墙架向下测量 870 mm (341/4"),确 二 个
6. 使用墙壁挂架预钻孔作为模板,对所有孔进行标记。在石膏板墙上预钻 6.5 mm (1/4") 。将 所 有 中 ,
拧到齐平止。固定有支架。确保上支架完全对牢固。对剩余支架重复执行上操作。
前视图
Doc #143841  Rev A  Page 21 of 50 Doc #143841  Rev A  Page 20 of 50
7. 举起面板 A靠在墙上挂架上方位置然后向墙壁挂架即可将面 A 挂在墙壁挂
。确 水 平
8. 在插入垂材之前清洁沟槽。距面板上沿 10 mm (3/8") 始 ,将 垂 直 型 材 入 槽
使预钻孔作为模板,对所有孔进行标记。取下型然后在石膏板墙上预钻 6.5 mm (1/4")
将墙锚插入孔中拧到齐平为止。重新插入垂直型材并将型材固定在墙壁接触的区
域。确保至少三点固定。
在面板长度方向上保垂直型材完全插槽内
9. 置面板 B/C小心插入面板下沿底角倾斜)让面板朝向之前安装的面板滑动,保面板
在长方向上接触后向下按压,使其固定在水平墙壁
对面板 B 执行以
所有 B 面板之对面板 C 执行以
提示拆卸面板,按与装相反的顺序操作。
Doc #143841  Rev A  Page 23 of 50 Doc #143841  Rev A  Page 22 of 50
产品
CeramicSteel 面 :永
PolyVision 证,有采用 e3™ CeramicSteel(高端书写表面)a3 CeramicSteel(协
产品/产品其书写和质,且在使用寿产品
使周期内(不管哪个在先)泽变和颜色一致性
板构造:10 年有限质保
PolyVision 证,在正常大气密封防潮的情况下我们的挂板10 年内不会基底
或翘曲 。
件:2 年有限质保
PolyVision 证我们的附件包括但不限协作工栏和磁性圆板擦)常使用条件的预期
使寿命为 2 年。质保不含记号笔和粉笔等耗
,则 PolyVision客户书后自行
正这种不一致。用上述方法实施的纠正应该使 CeramicSteel够实PolyVision所有
此保证仅用于正常使和维护涵盖由不正确处理、蓄意破坏或滥或者未遵循
PolyVision 维护说明和建议所造成的缺陷。
客户或 PolyVision 书面同意或事先知悉的其他商行对产进行了则此
保证效。此保证不包含拆卸或重新安装的费用。此保证 2019712 ,并
PolyVision 向客发布的所有事先表面保证的条款和条件
有限保证是品缺陷的唯一补我们未提供其他明示或暗示包括不限任何适
于特定途的适销性或适用性的暗示保证。PolyVision 不对由任何产品缺陷造成的间接或附
带 赔偿损失负责。
Doc #143841  Rev A  Page 25 of 50 Doc #143841  Rev A  Page 24 of 50
3 性の要
4 取りいと保
5 と部
6 1830 直 ウォ ーラ ケ ットの 設
7 2420垂 直 ウォ ーブ ラ ケット の 設
8 1830水 平 ウォ ーブ ラ ケット の 設
9 2420水 平 ウォ ーブ ラ ケ ット
13 保証
日本
a3 CeramicSteel Frameless Flow - 式ドラ
ー ス 、非
性の
壁の構造の低要
ドを使用しライォールの場
厚さ0.6 mm0.02 )以 、金 ッ ド
48.8 mm x 50 mm1.92 x 1.97インチ)
ッドの 心 600 mm24イン
厚さ2 x 12.5 mm0.49イ ン )以 膏 ド ラ
ウ ォ ル( Xタイ
35 mm1.34イ ン )ド イ ウ 250
mm12インチ)
する
警 告! 、ボ ー ド
造である要がます壁の
限 、表 14ージ)に記載された重量を支えられ
るものである必ます
耐震要件の有無は、計担当者にご相談
ください
ドを使用しライォールの場
ッドグ レ SPFDFLまたはHem-Fir 45 mm x
70 mm1.5 x 3.5イン
ッドの 心 600 mm24イン
厚さ25 mm5/8イ ン )以 膏 ド ラ イ ウ
X )( 、 ま 2 x 12.5 mm
1/2イ ン )( EU合)
35 mm6 x 11/4イ ン )ド イ ウ ォ
250 mm12インチ)
Doc #143841  Rev A  Page 27 of 50 Doc #143841  Rev A  Page 26 of 50
取り
取り扱
a3 CeramicSteel 、出 ラ フ ト
透 明エチレンフで 保 護されて
す 。 、パ
してくい 。
防ぐた取り扱に注意しください
取り扱ネルスタックら滑らせち上
くださいたりしたり
するきはに保ださい
a3は決して床上に立てて置かないでく
これジのを防ぐため
パネルの損擦り傷具合を防ぐため、パネ
ル上またはネルにごみが着したままにしない
ください
パネルを取り扱う際我をないよう、上の
項 に 従 ってく
パネ面をおがくずやスパーク粒子から
保 護てくい 。
a3 CeramicSteel 、電 し た り
けたがあ手作業で切断
、エ ッ 2 mmけること
す 。欠 2 mm え る 、切
工具の状態を確認すに、パネルが振
適切に支持、固定を確認
ださい
た部分や穴を開けた部分はすべて湿
するたPVCテ ープ や シ ー リン グ ロ フ
ま た は シ ーン グ ワ ッシ ャー で 覆 ってくだ さ
扱 い方 法しくは 、a3取り扱
事 項をご覧くだい 。
保管
ネルた状で、ごみ着しないよう
してくい 。
ネル5090°F1032°C)の 管 し
てくい 。
屋 外で 保 管するすべて、しい気 象 条 件
てくい 。
パネルは堅らな表面に置いい。水の
るとろには管しないでください
a3 CeramicSteel パネル3ねて保管しな
いでくだ
を立てて置いた角の部分やすい
状 態で 保管したりすることは 絶めくださ
、ま ま し
まいの マネージャ
ー、PolyVisionカスタマーサービスまでお問い合
くださいPolyVisionグローバタマーサービスに
は、polyvision.comいただけます
1 水平方向での設
製品 重 量( kg/ ン ド )/ パ
Frameless Flow 1830 28 kg/61.73ンド
Frameless Flow 2420 37 kg/81.57ンド
ドリル
ットNo.2
グ ラサ クン カップ リ
ー( 2個)
ペンチ
鉛筆
器またはーザー水
2または3はしご
巻尺
必要な工具部品
要な工
同梱部品
注意の図実際のサは異なの数は、製品異な
す。ボ ードの 大 きォ ーン カじ の 数 変 わた めで す。*
水 平 ウブ ラ ケ ット 直 ウブ ラ ケ ット
水平ネルまたは
ネル
アンカー ねじ
2
製品 パネルA(右) パネルB(中間) ネルC(左)
垂直ブラケ
ットの 個 数
水平ブラケ
ットの 個 数
じ/
カーの
垂直ブラケ
ットの 個 数
水平ブラケ
ットの 個 数
じ/
ンカーの
個数
垂直ブラケ
ットの 個 数
水平ブラケ
ットの 個 数
じ/
ンカーの
個数
垂直型Frameless Flow
Frameless Flow 1830 1 2 17 1 2 17 0 2 10
Frameless Flow 2420 1 3 24 1 3 24 0 3 15
水平Frameless Flow
Frameless Flow 1830 1 2 15 1 2 15 0 2 10
Frameless Flow 2420 1 2 25 1 2 25 0 2 20
Frameless Flowネル
パネルA
パネルB中間
パネルC
Doc #143841  Rev A  Page 29 of 50 Doc #143841  Rev A  Page 28 of 50
Frameless Flow
1830 直 ウォ ーブ ラ ケットの 設
1. Frameless Flow 置 する 位 置 の 中 心 線 を 決 めま す。
2. ネルAとパネルC中 心 線 を 決 めま す。こ れが ブ ラットの 中 心 線 に なま す。パ ネ ル 数 奇 数 の 場
合:壁 か ら 左 1185 mm465/8ンチパネル数が偶数の場合壁面中心左右
592.5mm235/16イ ン )。
3. 面から設置するパネルの部までの高さ決めます
4. に決めておいたパ部から下へ220 mm811/16ンチ)測りますこれが上部ウォール
の底部の置になます
5. 1個目の水平ウォーブラケッから下へ1515 mm595/8イ ン チ )測 2個目のブラケットの置を決
す。
6. ンプレーてウォーブラケットの取付穴を使用し、べて穴開け位置をーキングします
イウォ6.5 mm1/4インすべのア入しように
み ま す。べ てブ ラ ケ ットを 固 定 しま す。 部 ブ ラ ケット の 置 を り 合 わ せ 、水 平 に な るし 、
しっかり固定しすべてのブラケットについて同じ繰り返し
正面図
Frameless Flow
2420 直 ウォ ーブ ラ ケットの 設
1. Frameless Flow 置 する 位 置 の 中 心 線 を 決 めま す。
2. ネルAとパネルC中 心 線 を 決 めま す。こ れが ブ ラットの 中 心 線 に なま す。パ ネ ル 数 奇 数 の 場
合:壁 か ら 左 1185 mm465/8ンチパネル数が偶数の場合壁面中心左右
592.5mm235/16イ ン )。
3. 面から設置するパネルの部までの高さ決めます
4. に決めておいたパ部から下へ220 mm811/16ンチ)測りますこれが上部ウォール
の底部の置になます
5. 1個目の水平ウォーブラケッから、下へ1065 mm4115/16イ ン )に 2 目 のブ ラ ケ ット2015 mm
3個目のブラケットの置を決
6. ンプレーてウォーブラケットの取付穴を使用し、べて穴開け位置をーキングしますライ
ウォール6.5 mm1/4インすべのア入しなるよう
ますのブラケットを固ブラケットの置をぴっり合わせ、水平になるようにし、
かり固定しますてのブラケットについて同じ繰り返し
正面図
Doc #143841  Rev A  Page 31 of 50 Doc #143841  Rev A  Page 30 of 50
Frameless Flow
1830水 平 ウォ ーブ ラ ケ ットの 設
1. Frameless Flow 置 する 位 置 の 中 心 線 を 決 めま す。
2. ネルAとパネルC中 心 線 を 決 めま す。こ れが ブ ラットの 中 心 線 に なま す。パ ネ ル 数 奇 数 の 場 :壁 面 の
から左1830 mm72ル数が偶数の壁面の中心から左右915 mm36イ ン )。
3. 面から設置するパネルの部までの高さ決めます
4. に決めておいたパ部から下へ220 mm811/16ンチ)測りますこれが上部ウォールラケッ
の底部の置になます
5. 1個目の水平ウォーブラケッから下へ870 mm341/4イ ン )測 り 、2ブラケットの置を決ます
6. テンートとウォー付 穴使 用しすべての穴 開位 置をマーキンしまドライウォー
ルに6.5 mm1/4インす。すべてのなるようす。すべ
てのしま をぴったりなるようにしっかり固定しま
てのブラケットについて同じ繰り返し
正面図
Frameless Flow
2420水 平 ウォ ーブ ラ ケット
1. Frameless Flow 置 する 位 置 の 中 心 線 を 決 めま す。
2. ネルAとパネルB/Cの 中 心 線 を 決 めま す。れ が ラ ケットの 中 心 線 に なりま す。パ ネ が 奇 数 の 場 合:壁 面 の
から左550 mm215/8イン+ 1320 mm5115/16インチ)+ 1100 mm435/16イ ン )。パ
偶数の場合壁面の中心左右に660 mm26インチ)+ 1100 mm425/16イ ン )。
3. 面から設置するパネルの部までの高さ決めます
4. に決めておいたパ部から下へ220 mm811/16ンチ)測りますこれが上部ウォールラケットの
底部の位置にな
5. 1個目の水平ウォーブラケッから下へ870 mm341/4イ ン )測 り 、2ブラケットの置を決ます
6. テンートとウォー付 穴使 用しすべての穴 開位 置をマーキンしまドライウォー
ルに6.5 mm1/4インす。すべてのなるようす。すべ
しま ったりるようにしっかり固しま
のブラケットについて同じ繰り返します
正面図
Doc #143841  Rev A  Page 33 of 50 Doc #143841  Rev A  Page 32 of 50
7. ネルA持ち上てウォールラケットにウォーブラケットの上でネル押し
きにドさせネルなるようにください
8. 直プを挿入る前にの内ごみどを取ますパネル部から
10mm3/8 イ ル す 。テ
使 用穴 開位 置をマーキンしまプ ロファル を取りドライウォー
6. 5 mm1/4ン チの 穴 を 開 けま す。ア ンカ ー を穴 に 挿し 、平 らに なに ねじ 込 み ま す。
垂 直 プ ロファイル を再 度 プ ロァイル 壁 に 触 す部 位 でプ ロァイル を 固 定す。
上部中央、下部でプロルを固定すい。
パネルの長にわ直プを完全に溝に挿ださ
9. ネルB/Cますパネルの底部を端の角斜めにながら重に す 。先
り付けたネルに向てパネルをスライドさせ、ネルがパネルにわたっ
るようにしウォにしっかとは
ネルBだけ繰り返します
ネルB す べ し た 、パ Cについても手繰り返し
ヒン取り外す取りください
Doc #143841  Rev A  Page 35 of 50 Doc #143841  Rev A  Page 34 of 50
レーシパネ
CeramicSteel 面 :永
PolyVisionは、e3™ CeramicSteelの筆記面)a3™ CeramicSteelコラボレ
製のべて加工面製品建物寿命、は製品の使
期間のずれの筆記品質び消去品質を保持し、光沢の変化
の 濃 度 を 維 持 すことを 保 証す。
ネル10定保
PolyVisionネルが下および湿ら封止さいる合、10間の
離したり、反りが生じたりとを証します
品:2年限定保
PolyVisionは、通常の条件下で使れた場Collaborative ToolBarび 丸 型 マネッ
レイを制限な当社の付属品が2年間に動作すを保
す。ー や チィッの 消 耗 品 は 、付 属品 保 証 の 対 す。
がこ沿ないことが明ららのる通
よりPolyVisionその自由理またはによかる不合を修正
記の方法での修正は、CeramicSteelするPolyVisionすべ ての責 任 の
は通常の使用およびンテスにのみ適され不適切な扱い
行為またはあるいはPolyVisionンテナンテナスに関する推
項に従なかっに起因する不合は適
PolyVision書面による同または事前の知のにかかわら様または他
業者て製が加場合は、保証は無効保証は、撤去
た は ま れ せ ん 。本 2019712日付これまでに
PolyVisionお客発行べての筆記面保証の諸条件に
本限製品の欠陥に対す唯一の済策商品性は特定的に対す
がこれらに限定さないその的または
されせんPolyVisionは、製品の欠陥から発生生的は付随的な損
害にて責任を負わないものます
Doc #143841  Rev A  Page 37 of 50 Doc #143841  Rev A  Page 36 of 50
3 안전 요건
4 패널 취급 보관
5 필수 재료 장비
6 1830 수직 벽면 브래킷 설치 위치
7 2420 수직 벽면 브래킷 설치 위치
8 1830 수평 벽면 브래킷 설치 위치
9 2420 수평 벽면 브래킷 설치 위치
13 보증
국어
a3 CeramicSteel Frameless Flow - 벽면 장착
화이트보드, 내진 기능 없음
안전 요건
필요한 최소 구조
금속 터드 있는 건식 벽체:
두께 0.6mm(0.02") 이상 금속 터드 48.8mm x
50mm(1.92" x 1.97") 용해야
최대 600mm(24") 심부 되는 스터드
2 x 12.5mm(0.49") 이상의 X 석고 건식 벽체를
용해야
250mm(12") 심부 되는 35mm(1.34")
건식 벽체 나사
구조 확인
주의! 보드의 무게 지탱 있을 정도
적절한 구조가 필요합니다. 구조가 최소한
4이지의 1 시된 무게를 지탱할
있어야 니다.
건물의 정식 지니어에게 문의해 지진 련한
요건이 있는지 인해야 합니다.
목재 스터드 있는 건식 벽체:
스터드 등급 SPF, DFL 또는 Hem-Fir 45mm x
70mm(1.5" x 3.5")
600mm(24") 중심부 되는 스터드
미국의 경우 두께 25mm(5/8") 이상, 유럽의 경우
두께 2 x 12.5mm(1/2") 이상 X 석고 건식 벽체를
용해야
250mm(12") 심부 되는 35mm
(#6 x 11/4") 건식 벽체 나사
Doc #143841  Rev A  Page 39 of 50 Doc #143841  Rev A  Page 38 of 50
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26

PolyVision Frameless Flow インストールガイド

タイプ
インストールガイド