PowerEdge 2850

Dell PowerEdge 2850 クイックスタートガイド

  • こんにちは!Dellラックマウントシステムユーザーガイドの内容をすべて読み終えました。このガイドには、RapidRailsとVersaRailsラックキットを使ったシステムのラックへの取り付け手順が詳細に説明されています。4ポストラックと2ポストラックの両方の取り付け手順、安全上の考慮事項、必要なツールと材料なども網羅しています。何かご質問があれば、お気軽にお尋ねください!
  • ラックへのシステム取り付けには、どのようなツールが必要ですか?
    RapidRailsとVersaRailsのどちらのキットを使用すべきですか?
    ラックに複数システムを取り付ける場合、どのような手順を踏むべきですか?
    ケーブルをどのように配線しますか?
Rack Installation Guide
Guide d'installation en rack
Rack-Installationsanleitung
ラック取り付けガイド
Guía de instalación del rack
Rack Installation Guide
Notes, Notices, and Cautions
NOTE: A NOTE indicates important information that helps you make better use of your computer.
NOTICE: A NOTICE indicates either potential damage to hardware or loss of data and tells you how to avoid
the problem.
CAUTION: A CAUTION indicates a potential for property damage, personal injury, or death.
____________________
Information in this document is subject to change without notice.
© 2004 Dell Inc. All rights reserved.
Reproduction in any manner whatsoever without the written permission of Dell Inc. is strictly forbidden.
Trademarks used in this text: RapidRails and VersaRails are trademarks of Dell Inc.
Other trademarks and trade names may be used in this document to refer to either the entities claiming the marks and names
or their products. Dell Inc. disclaims any proprietary interest in trademarks and trade names other than its own.
May 2004 P/N W1948 Rev. A00
Contents 1-3
Contents
CAUTION: Safety Instructions . . . . . . . . . . . . . . . . . . . . . . 1-5
SAFETY: Rack Mounting of Systems
. . . . . . . . . . . . . . . . . 1-5
Installation Instructions
. . . . . . . . . . . . . . . . . . . . . . . . . 1-6
Four-Post Rack Installation
. . . . . . . . . . . . . . . . . . . . . . . . 1-7
Before You Begin
. . . . . . . . . . . . . . . . . . . . . . . . . . 1-7
Recommended Tools and Supplies
. . . . . . . . . . . . . . . . . . 1-7
RapidRails Rack Kit Contents
. . . . . . . . . . . . . . . . . . . . 1-8
VersaRails Rack Kit Contents
. . . . . . . . . . . . . . . . . . . . 1-8
Installation Tasks
. . . . . . . . . . . . . . . . . . . . . . . . . . 1-9
Removing the Rack Doors
. . . . . . . . . . . . . . . . . . . . . . 1-9
Marking the Rack
. . . . . . . . . . . . . . . . . . . . . . . . . . 1-10
Installing the RapidRails Slide Assemblies
. . . . . . . . . . . . . . 1-12
Installing the VersaRails Slide Assemblies
. . . . . . . . . . . . . . 1-13
Installing the System in the Rack
. . . . . . . . . . . . . . . . . . . 1-14
Installing the Cable-Management Arm
. . . . . . . . . . . . . . . . 1-16
Replacing the Rack Doors
. . . . . . . . . . . . . . . . . . . . . . 1-20
Two-Post Rack Installation
. . . . . . . . . . . . . . . . . . . . . . . . 1-21
Two-Post Rack Installation Tasks
. . . . . . . . . . . . . . . . . . 1-21
Recommended Tools and Supplies
. . . . . . . . . . . . . . . . . . 1-21
Rack Kit Contents
. . . . . . . . . . . . . . . . . . . . . . . . . . 1-22
Marking the Rack
. . . . . . . . . . . . . . . . . . . . . . . . . . 1-22
Installing the Slide Assemblies in the Rack
. . . . . . . . . . . . . . 1-24
Installing the System in the Rack
. . . . . . . . . . . . . . . . . . . 1-30
Installing the Cable-Management Arm
. . . . . . . . . . . . . . . . 1-30
Routing Cables
. . . . . . . . . . . . . . . . . . . . . . . . . . . 1-30
Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-31
1-4 Contents
Figures
Figure 1-1. RapidRails Rack Kit Contents . . . . . . . . . . 1-8
Figure 1-2. VersaRails Rack Kit Contents
. . . . . . . . . . 1-9
Figure 1-3. One Rack Unit
. . . . . . . . . . . . . . . . . . 1-10
Figure 1-4. Marking the Vertical Rails
. . . . . . . . . . . . 1-11
Figure 1-5. Installing the RapidRails Slide Assemblies
. . . . 1-12
Figure 1-6. Installing the VersaRails Slide Assemblies
. . . . 1-14
Figure 1-7. Installing the System in the Rack
(RapidRails or VersaRails)
. . . . . . . . . . . . 1-15
Figure 1-8. Installing the Cable-Management Arm
. . . . . . 1-17
Figure 1-9. Installing the Cable-Management Arm
. . . . . . 1-18
Figure 1-10. Routing the Power Cords
. . . . . . . . . . . . 1-19
Figure 1-11. Routing Cables
. . . . . . . . . . . . . . . . . 1-20
Figure 1-12. Two-Post Rack Kit Components
. . . . . . . . . 1-22
Figure 1-13. Two-Post, Open-Frame Relay Rack
Universal-Hole Spacing
. . . . . . . . . . . . . 1-23
Figure 1-14. Two-Post, Open-Frame Relay Rack
Wide-Hole Spacing
. . . . . . . . . . . . . . . 1-23
Figure 1-15. Brackets Prepared for Center-Mount
Installation
. . . . . . . . . . . . . . . . . . . 1-25
Figure 1-16. Installing the Slide Assemblies
for Center-Mount Configuration
. . . . . . . . . 1-26
Figure 1-17. Rotating the Front Mounting Bracket
for Flush-Mount Installation
. . . . . . . . . . . 1-28
Figure 1-18. Installing the Slide Assemblies
for Flush-Mount Configuration
. . . . . . . . . . 1-29
Rack Installation Guide 1-5
CAUTION: Safety Instructions
Use the following safety guidelines to help ensure your own personal safety and to help
protect your system and working environment from potential damage. For complete safety
information, see the
Product Information
Guide
.
SAFETY: Rack Mounting of Systems
Observe the following precautions for rack stability and safety.
Systems are considered to be components in a rack. Thus, "component" refers to any system
as well as to various peripherals or supporting hardware.
CAUTION: Installing systems in a rack without the front and side stabilizers installed could
cause the rack to tip over, potentially resulting in bodily injury under certain circumstances.
Therefore, always install the stabilizers before installing components in the rack.
After installing system/components in a rack, never pull more than one component out of the rack
on its slide assemblies at one time. The weight of more than one extended component could
cause the rack to tip over and injure someone.
NOTE: Your system is safety-certified as a free-standing unit and as a component for use in a rack
cabinet using the customer rack kit. The installation of your system and rack kit in any other rack
cabinet has not been approved by any safety agencies. It is your responsibility to ensure that the
final combination of system and rack complies with all applicable safety standards and local
electric code requirements. The manufacturer disclaims all liability and warranties in connection
with such combinations.
System rack kits are intended to be installed in a rack by trained service technicians.
If you install the kit in any other rack, be sure that the rack meets the specifications.
CAUTION: Do not move racks by yourself. Due to the height and weight of the rack, a minimum
of two people should accomplish this task.
Before working on the rack, make sure that the stabilizers are secured to the rack,
extended to the floor, and that the full weight of the rack rests on the floor. Install front
and side stabilizers on a single rack or front stabilizers for joined multiple racks before
working on the rack.
Always load the rack from the bottom up, and load the heaviest item in the rack first.
Make sure that the rack is level and stable before extending a component from the rack.
Use caution when pressing the component rail release latches and sliding a component
into or out of a rack; the slide rails can pinch your fingers.
After a component is inserted into the rack, carefully extend the rail into a locking
position, and then slide the component into the rack.
1-6 Rack Installation Guide
Installation Instructions
This installation guide provides instructions for trained service technicians installing one or more
systems in an open-frame relay rack or in a rack cabinet. The RapidRails™ rack kit can be installed
without tools in manufacturer’s rack cabinets that have square holes; the VersaRails™ rack kit can
be installed in most industry-standard rack cabinets that have square or round holes. The
procedures for installing both RapidRails and VersaRails rack kits are similar. One rack kit is
required for each system installed in the rack.
This guide includes procedures for the following rack kits:
RapidRails kit in a four-post rack cabinet
VersaRails kit in a four-post rack cabinet
Two-post kit (installed in either center-mount or flush-mount configuration,
for 3- or 6-inch-wide racks)
For ease in troubleshooting and determining the health of your system, some rack kits include a
status-indicator cable that relays the information from the two-color status indicators on the front
and back panels to the back of the cable-management arm. For more information on these
indicators, see your system
User’s Guide
.
Before attempting this installation, you should read through this entire document carefully.
CAUTION: Do not install rack kit components designed for another system. Use only the rack kit for
your system. Using the rack kit for another system may result in damage to the system and personal
injury to yourself and to others.
Rack Requirements for VersaRails
NOTICE: The VersaRails rack kit is intended to be installed by trained service technicians in a rack that
meets the specifications of American National Standards Institute (ANSI)/Electronic Industries
Association (EIA) standard ANSI/EIA-310-D-92, International Electrotechnical Commission (IEC) 297, and
Deutsche Industrie Norm (DIN) 41494. One rack kit is required for each system that is installed in a rack.
Do not overload the AC supply branch circuit that provides power to the rack.
The total rack load should not exceed 80 percent of the branch circuit rating.
Ensure that proper airflow is provided to components in the rack.
Do not step on or stand on any component when servicing other components in a rack.
CAUTION: Safety Instructions (continued)
Rack Installation Guide 1-7
Four-Post Rack Installation
Before attempting this installation, you should read through this entire procedure carefully.
Before You Begin
Before you begin installing your system in the rack, carefully read the safety instructions found at
the beginning of this guide, as well as the safety instructions found in your system’s
Product
Information Guide
for additional information.
CAUTION: When installing multiple systems in a rack, complete all of the procedures for the current
system before attempting to install the next system.
CAUTION: Rack cabinets can be extremely heavy and move easily on the casters. The cabinet has no
brakes. Use extreme caution while moving the rack cabinet. Retract the leveling feet when relocating
the rack cabinet. Avoid long or steep inclines or ramps where loss of cabinet control may occur. Extend
the leveling feet for support and to prevent the cabinet from rolling.
Important Safety Information
Observe the safety precautions in the following subsections when installing your system in the rack.
CAUTION: You must strictly follow the procedures in this document to protect yourself as well as
others who may be involved. Your system may be very large and heavy, and proper preparation and
planning are important to prevent injury to yourself and to others. This becomes increasingly important
when systems are installed high up in the rack.
Rack Stabilizer Feet
CAUTION: Installing systems in a rack without the front and side stabilizer feet installed could cause
the rack to tip over, potentially resulting in bodily injury under certain circumstances. Therefore,
always install the stabilizer feet before installing components in the rack.
CAUTION: After installing systems in a rack, never pull more than one system out of the rack on its
slide assemblies at one time. The weight of more than one extended system could cause the rack to tip
over and cause injury.
The stabilizer feet help prevent the rack from tipping over when a system or other component is
pulled out of the rack with the slide assemblies fully extended. Refer to the documentation
provided with the rack cabinet for instructions on installing and anchoring the stabilizer feet.
Recommended Tools and Supplies
You may need the following tools and supplies to install the system in a four-post rack:
A #2 Phillips screwdriver (for installing VersaRails slide assemblies)
Masking tape or a felt-tip pen, for use in marking the mounting holes to be used
1-8 Rack Installation Guide
RapidRails Rack Kit Contents
The RapidRails rack kit includes the following items (see Figure 1-1):
One pair of RapidRails slide assemblies
One cable-management arm
One status indicator cable (if applicable)
Tie-wraps (not shown in Figure 1-1)
Figure 1-1. RapidRails Rack Kit Contents
VersaRails Rack Kit Contents
The VersaRails rack kit includes the following items (see Figure 1-2):
One pair of VersaRails slide assemblies
One cable-management arm
One status indicator cable (if applicable)
Eight 10-32 x 0.5-inch flange-head Phillips screws
Tie-wraps (not shown in Figure 1-2)
NOTE: The nonmetric screws described in illustrations and in procedural steps are identified by size and
number of threads per inch. For example, a #10 Phillips-head screw with 32 threads per inch is identified
as a 10-32 screw.
slide assemblies (2)
cable-management arm
status indicator cable (if applicable)
Rack Installation Guide 1-9
Figure 1-2. VersaRails Rack Kit Contents
Installation Tasks
Installing a rack kit involves performing the following tasks in their numbered order:
1
Removing the rack doors
2
Marking the rack (if necessary)
3
Installing the slide assemblies in the rack:
RapidRails installation
VersaRails installation
4
Installing the system in the rack
5
Installing the cable-management arm
6
Routing cables
7
Replacing the rack doors
Removing the Rack Doors
See the procedures for removing doors in the documentation provided with your rack cabinet.
CAUTION: Because of the size and weight of the rack cabinet doors, never attempt to remove or install
them by yourself.
CAUTION: Store the two doors where they will not injure someone if the doors accidently fall over.
slide assemblies (2)
10-32 x 0.5-inch
flange-head
Phillips screw (8)
cable-management arm
status indicator cable (if applicable)
1-10 Rack Installation Guide
Marking the Rack
You must allow 2 U (88 mm, or 3.5 inches) of vertical space for each system you install in the rack.
Rack cabinets that meet EIA-310 standards have an alternating pattern of three holes per rack unit
with center-to-center hole spacing (beginning at the top hole of a 1-U space) of 15.9 mm, 15.9 mm,
and 12.7 mm (0.625 inch, 0.625 inch, and 0.5 inch) for the front and back vertical rails (see
Figure 1-3). Rack cabinets may have round or square holes.
NOTE: The vertical rails may be marked by horizontal lines and numbers in 1-U increments. If you wish,
you can make a note of the number marking on the rack’s vertical rail. It is not necessary to mark or place
tape on the rack. If you choose this method, skip ahead to the procedure "Installing the RapidRails Slide
Assemblies."
Figure 1-3. One Rack Unit
CAUTION: If you are installing more than one system, install the slide assemblies so that the first
system is installed in the lowest available position in the rack.
To mark the rack, perform the following steps:
1
Place a mark on the rack’s front vertical rails where you want to locate the bottom of the
system you are installing in the rack cabinet.
The bottom of each 1-U space is at the middle of the narrowest metal area between holes
(marked with a horizontal line on some rack cabinets—see Figure 1-4).
1 U (44 mm or 1.75 inches)
12.7 mm (0.5 inch)
15.9 mm (0.625 inch)
15.9 mm (0.625 inch)
12.7 mm (0.5 inch)
Rack Installation Guide 1-11
2
Place a mark 88 mm (3.5 inches) above the original mark you made (or count up six holes in
a rack that meets EIA-310 standards) and mark the rack’s front vertical rails with a felt-tipped
pen or masking tape (if you counted holes, place a mark just above the top hole). This mark or
piece of tape indicates where the system’s upper edge will be located on the vertical rails
(see Figure 1-4).
Figure 1-4. Marking the Vertical Rails
tape on vertical rail
1-12 Rack Installation Guide
Installing the RapidRails Slide Assemblies
1
At the front of the rack cabinet, position one of the RapidRails slide assemblies so that
its mounting-bracket flange fits between the marks or tape you placed on the rack
(see Figure 1-5).
The top mounting hook on the slide assembly’s front mounting bracket flange should enter
the top hole between the marks you made on the vertical rails.
2
Push the slide assembly forward until the top mounting hook enters the top square hole that
you placed a mark just above on the vertical rail, and then push down on the mounting-
bracket flange until the mounting hooks seat in the square holes and the push button pops
out and clicks (see Figure 1-5).
Figure 1-5. Installing the RapidRails Slide Assemblies
front of rack
slide assembly (2)
mounting hooks (2)
push button
mounting-
bracket flange
Rack Installation Guide 1-13
3
At the back of the cabinet, pull back on the mounting-bracket flange until the top mounting
hook is in the top square hole, and then push down on the flange until the mounting hooks
seat in the square holes and the push button pops out and clicks.
4
Repeat steps 1 through 3 for the slide assembly on the other side of the rack.
NOTE: Ensure that the slide assemblies are mounted at the same position on the vertical rails
on each side of the rack.
Installing the VersaRails Slide Assemblies
1
At the front of the rack cabinet, position one of the VersaRails slide assemblies so that its
mounting-bracket flange fits between the marks or tape (or numbered location) on the rack
(see Figure 1-6).
The four holes on the front of the mounting bracket should align with four of the holes
between the marks you made on the front vertical rail.
2
Install two 10-32 x 0.5-inch flange-head Phillips screws in the mounting flange’s top hole and
the third-from-top hole to secure the slide assembly to the front vertical rail (see Figure 1-6).
3
At the back of the cabinet, pull back on the mounting-bracket flange until the mounting
holes align with their respective holes on the back vertical rail.
4
Install two 10-32 x 0.5-inch flange-head Phillips screws in the back mounting flange’s top
and third-from-top holes to secure the slide assembly to the back vertical rail.
5
Repeat steps 1 through 4 for the slide assembly on the other side of the rack.
NOTE: Ensure that the slide assemblies are mounted at the same position on the vertical rails
on each side of the rack.
1-14 Rack Installation Guide
Figure 1-6. Installing the VersaRails Slide Assemblies
Installing the System in the Rack
CAUTION: If you are installing more than one system, install the first system in the lowest available
position in the rack.
CAUTION: Never pull more than one component out of the rack at a time.
1
Pull the two slide assemblies out of the rack until they lock in the fully extended position.
CAUTION: Because of the size and weight of the system, never attempt to install the system in the slide
assemblies by yourself.
2
Lift the system into position in front of the extended slides (see Figure 1-7).
3
Place one hand on the front-bottom of the system and the other hand on the back-bottom
of the system.
front of rack
slide assembly (2)
10-32 x 0.5-inch flange-
head Phillips screw
(4 per slide assembly)
mounting-bracket flange
Rack Installation Guide 1-15
4
Tilt the back of the system down while aligning the back shoulder screws on the sides
of the system with the back slots on the slide assemblies.
5
Engage the back shoulder screws into their slots.
Figure 1-7. Installing the System in the Rack (RapidRails or VersaRails)
6
Lower the front of the system and engage the front and middle shoulder screws in their slots
(the middle slot is just behind the yellow system release latch).
When all shoulder screws are properly seated, the system locking mechanism at the front
of each slide assembly clicks and locks the system into the slide assembly.
7
Press up on the slide release latch at the side of each slide to slide the system completely
into the rack.
system locking mechanism
shoulder screw
on system
1-16 Rack Installation Guide
8
Push in and turn the captive thumbscrews on each side of the front chassis panel to secure
the system to the rack.
NOTE: To remove the system from the slide assemblies, press down on the thumbpads of the system
locking mechanism, and then pull the system forward.
Installing the Cable-Management Arm
NOTICE: The cable-management arm can only be installed on the right side of the rack cabinet (as
viewed from the back).
To install the cable-management arm on the system, perform the following steps:
1
Facing the back of the rack cabinet, locate the latch on the end of the slide assembly.
2
Push the tab on the back end of the cable-management arm into the latch on the end of
the slide assembly (see Figure 1-8).
The latch clicks when locked.
3
Push the tab on the front end of the cable-management arm into a mating latch on the inner
segment of the slide assembly (see Figure 1-8).
The latch clicks when locked.
Rack Installation Guide 1-17
Figure 1-8. Installing the Cable-Management Arm
4
If applicable, install the system status indicator cable plug into its connector (see Figure 1-9).
5
Open the wire covers on the cable-management arm by lifting the center of the wire over the
top of the embossed round button on the front of the forward part of the arm and lifting the
wire over the top of a similar round button on the back part of the arm.
The wire cover swings open to enable cables to be routed within the arm.
6
Route the system status indicator end of the cable through the cable-management arm, and
install the indicator in its slot at the back end of the cable-management arm (see Figure 1-9).
latch on inner
segment of slide
assembly
cable-management arm
latch on end of slide
assembly
tab on front end
tab on back end
1-18 Rack Installation Guide
Figure 1-9. Installing the Cable-Management Arm
7
Connect the power cords to their receptacles on the back panel (see Figure 1-10).
NOTE: Use the strain-relief loops (if available) on the back of the power supplies to provide strain
relief for the power cables.
system status
indicator cable plug
wire covers in
open position
system status indicator
/